UBE - Batam


1. Power Plan

  • Configuration : 2 x 35 MW SC GTG
  • Connection to 150 kV of Batam grids system
  • Target COD by Q-4, 2013 
  • Gas Supplier : Premiere Oil

2. Gas Transportation

  • Gas Pipeline Route
  • Estimated there will be 2 routes:
    • Section 1 (4 km): from t junction of WNTS gas pipeline to Pemping Island will be developed by Premier Oil
    • Section 2 (15 km) : from Pemping island to Tanjung Uncang Batam Island will be developed by Consortium of PT PLNB and PT UBE
  • Estimated tie-in of Section 1 = 4km, Section 2 = 18 km. Total tie-in of North= about 22 km