{"id":1847,"date":"2021-12-23T10:53:18","date_gmt":"2021-12-23T03:53:18","guid":{"rendered":"https:\/\/medcoid.newcreata.com\/?post_type=project&p=1847"},"modified":"2022-07-04T15:23:01","modified_gmt":"2022-07-04T08:23:01","slug":"medco-cahaya-biothermal","status":"publish","type":"project","link":"https:\/\/medcopower.co.id\/id\/project\/medco-cahaya-biothermal\/","title":{"rendered":"Medco Cahaya Geothermal"},"content":{"rendered":"\n
Geothermal in Indonesia <\/strong><\/p>\n\n\n\n As a result of its volcanic geology, it is often reported that Indonesia has 40% of the world’s potential geothermal resources, estimated at 28,000 megawatts (MW).<\/p>\n\n\n\n Currently Indonesia is the world’s third largest geothermal electricity producer after the United States and the Philippines. Installed production capacity (2011) is almost 1,200 MW from six geothermal fields in Java, North Sumatra and North Sulawesi. In 2007, geothermal energy represented 1.9% of the country’s total energy supply and 3.7% of its electric power.<\/p>\n\n\n\n Blawan-Ijen Geothermal Project<\/strong><\/p>\n\n\n\n PT. Medco Power Indonesia (\u201cMPI\u201d) through its 100% owned subsidiary PT. Medco Cahaya Geothermal (\u201cMCG\u201d) is developing the 110 MW Blawan Ijen Geothermal Power Plant in Blawan Ijen, East Java, Indonesia (\u201cIjen Project\u201d). MCG is entitled for 35-year Geothermal Concession under Decree from Ministry of Energy and Mineral Resources (\u201cMEMR\u201d) (IPB No. 2683 K\/30\/MEMR\/2015).<\/p>\n\n\n\n Subsequently, in February 2013 MCG has signed PPA (Power Purchase Agreement) with PT. PLN Persero (Indonesian State-owned Power Company) for a 30 years contract. As stated in PPA, the COD (Commercial Operation Date) is expected in 2020 – 2021. The project will have 2 x 55 Megawatt (MW) power generation and approximately 28 km transmission line to the nearest substation (Banyuwangi Substation).<\/p>\n\n\n\n