Prior to joining MPI, Hartono spent many years in the investment and finance during his tenure in Truba Jurong Engineering as CFO and H&Q Asia Pacific as Assistant Vice President.  Throughout his work, Hartono was exposed to the energy and power plant business and construction as he assumed directorship in Truba Jurong, Panin Energy Business and others?.?

OVERVIEW Energi Listrik Batam

PT Energi Listik Batam (ELB) was established on 7th March 2012 as an Independent Power Producer (IPP) which then it signed Power Purchase Agreement with PT PLN Batam. ELB has to develop, construct, finance and operate a Simple Cycle Gas Turbine Power Plant with the contract capacity at 2x35 MW located in Tanjung Uncang, Batam Island (“SCPP”). This site is about, Located 35 km from the Hang Nadim International Airport.

With the support of PT MEDCO POWER INDONESIA as the majority shareholder, ELB is well positioned to fully employ corporate strength in strategic management, project management and operational best practices. We deploy the full range of our experiences and allocate the appropriate resources to attain optimum outcomes for the benefit of the stakeholders. This project was started in the year of 2009 when PT Medco Power Indonesia (MPI) acquired majority shares of PT Universal Batam Energy (UBE). UBE is an Indonesian company who has signed Gas Sales Agreement with Premier Oil on 15 April 2008, and thereafter UBE participated in a tender process in PLN Batam for Simple Cycle Gas Turbine Power Plant 2x35 MW in Tanjung Uncang Batam, and subsequently was appointed as preferred bidder for such tender. As a preferred bidder, UBE is required to establish a special purpose company i.e. ELB to sign Power Purchase Agreement with PLN Batam.

Our simple cycle power plant has achieved commercial operation date in 2016, which is Unit 2 in January 2016 while Unit 1 in May 2016. Contracted Capacity for SCPP is 2x35 MW and connected to 150 kV Batam grids system. ELB has gas supplies from PT PGN consisting 15 BBTUD through onshore pipeline and 9.18 BBTUD from offshore pipeline. UBE as a parent company of ELB is also having gas supply agreement with Premier Oil from Block A Natuna for 20 BBTUD.

ELB is on process to develop 40 MW add-on Combined Cycle with PLN Batam and it is expected to begin COD by Q 1 2020.

MANAGEMENT

 

Hartono Indriyanto

President Director

Indonesian citizen, born in 1962.  Hartono Indriyanto has accumulated 31 years of work experience mostly in investment and energy business.  He is now assigned as President Director in Universal Batam Energi and Energi Listrik Batam both are subsidiaries of Medco Power Indonesia.
Prior to joining MPI, Hartono spent many years in the investment and finance during his tenure in Truba Jurong Engineering as CFO and H&Q Asia Pacific as Assistant Vice President.  Throughout his work, Hartono was exposed to the energy and power plant business and construction as he assumed directorship in Truba Jurong, Panin Energy Business and others?.?