The Energy Building 8th Fl, SCBD Lot 11A, Jl. Jend. Sudirman Kav. 52-53, Jakarta 12190

corsec.mpi@medcoenergi.com

021-2995-3300

Project

MITRA ENERGI BATAM

PT MEB was established on 17th November 2003 as an Independent Power Producer (IPP) and Operations and Maintenance (O&M) srvice provider. MEB develop, construct and operate a Combined Cycle Power Plant using 2×27.5 MW Rolls Royce Aero Derivative RB211-GT and 20.6 MW STG Kawasaki. MEB has succesfully comercially operated in 2004 ( Gas Turbine) and […]

MITRA ENERGI BATAM Read More »

DALLE ENERGI BATAM

PT DEB didirikan pada Maret 2005. Sebagai Independent Power, DEB menggunakan pembangkit Combined Cycle Power 2x27,5 MW Rolls Royce Aero Derivative RB211-GT dan 20.6 MW STG Kawasaki. DEB telah beroperasi secara komersial pada bulan April 2006 (Gas Turbine) dan pada bulan Maret 2010 (Combined Cycle) Download QR

DALLE ENERGI BATAM Read More »

ENERGI LISTRIK BATAM

PT Energi Listik Batam (ELB) was established on 7th March 2012 as an Independent Power Producer (IPP) which then it signed Power Purchase Agreement with PT PLN Batam. ELB develop, construct, finance and operate a Simple Cycle Gas Turbine Power Plant with the contract capacity at 2×35 MW located in Tanjung Uncang, Batam Island (“SCPP”).

ENERGI LISTRIK BATAM Read More »

Energi Prima Elektrika

Medco Power through Energi Prima Elektrika owns and operates a 2×6 MW capacity gas-fired power plant in Patih Galung, Prabumulih – South Sumatera. PPA with PLN was already signed in 2004. The plant started to operate commercially on June 1, 2006 and was put under Medco Power Indonesia’s management on July 29, 2010 after acquiring

Energi Prima Elektrika Read More »

Multidaya Prima Elektrindo

In conjuction with Energi Prima Elektrika’s acquisition, Medco Energi through Medco Power Indonesia also acquired 85% shares of this company who owns and operates a 2×6 MW capacity gas-fired power plant in Kali Doni, Palembang – South Sumatera. The plant started to operate commercially on April 30, 2008 and was put under Medco Power’s Indonesia’s

Multidaya Prima Elektrindo Read More »

MEDCO RATCH POWER RIAU

MRPR was declared as the winner of the project plant in November 2016 following an open bidding by PLN in April 2015. The development of the IPP project will commence in 2017, and completion is expected within 36 months after the financial closure which is scheduled to take place 12 months after the PPA signing. MPI

MEDCO RATCH POWER RIAU Read More »

MEDCO GEOTHERMAL SARULLA

Pada tanggal 29 September 2016, Medco Power melalui anak perusahaannya PT Medco Geothermal Sarulla (MGS) bersama dengan SOL telah menandatangani Operation and Maintenance Agreement untuk pembangkit listrik Sarulla 330 MW yang berlaku efektif sejak tanggal penandatanganan. Medco Power telah diakui dan dipercaya untuk mengoperasikan dan memelihara proyek pembangkit listrik tenaga panas bumi terbesar di dunia.

MEDCO GEOTHERMAL SARULLA Read More »

Medco Cahaya Geothermal

Geothermal in Indonesia  As a result of its volcanic geology, it is often reported that Indonesia has 40% of the world’s potential geothermal resources, estimated at 28,000 megawatts (MW). Currently Indonesia is the world’s third largest geothermal electricity producer after the United States and the Philippines. Installed production capacity (2011) is almost 1,200 MW from

Medco Cahaya Geothermal Read More »